Case: Customer needs to move a 320lb rear axle from one location to another every 45 seconds, 24 hours per day, 6 days per week with no coffee breaks. Safely.

Solution: Design a cell with a KUKA KR270 R2900 Ultra Robot Arm to make the transfer:

Process:

Station 1:

  1. Pallet arrives in station
  2. Sensors detect
    1. Pallet present
    2. Pallet in correct orientation
    3. Frame present
  3. Pallet is lift and located
  4. Pallet is contained
  5. Robot moves to clamp position
  6. EOAT uses sensors to validate frame present
  7. EOAT clamps frame using 2 sensors to validate
  8. Robot lifts and clears frame from pallet
  9. Robot flips the frame over while traversing the space to Station 1
  10. Robot waits at Station 1 pounce position

Station 2:

  1. Pallet arrives in station
  2. Sensors detect
    1. Pallet present
    2. Pallet in correct orientation
    3. No frame present
  3. Pallet is lift and located
  4. Pallet is contained
  5. Robot moves to unclamp position
  6. Position is validated with 2 sensors
  7. EOAT unclamps part
  8. Robot clears frame and moves away
  9. EOAT returns to pick orientation
  10. Robot waits at Station 2 pounce

Lion provided:

  • Electrical design of system
    • system will be designed to Customer standard specifications (see preliminary BOM below)
  • Mechanical design of system
  • Purchasing or Manufacturing of all components identified in the design phase of the project (initially identified major components listed below)
    • 2x pallet lift and locate devices
    • 2x pallet containment devices
    • 2x EOAT
      • Will be interchangeable with existing manual EOAT
      • Locators will be tool steel
      • Clamp contact plates will be tool steel or bronze
      • Will not damage frame or Ecoat
      • 1x KUKA 2900 Robot
      • mastering fixture
      • Safe Operations
      • Gripper Tech
      • Spot Tech
      • Visual
      • location (see Proposed Layout) will be out of the way in the event of a return to the manual manipulator
  • 1x Safety guarding with two (2) doors and Euchner switches. The pallet entry and exit points are protected by orange curtains, signage and e-stops mounted on the inside and the outside of each gate
  • 1x EOAT change out stand
  • 1x cart to carry 2 EOAT’s
  • 1x Controls package (see preliminary BOM)
  • Assembly, programming and run-off at Lion facility
  • Installation and run-off at Customer Location
    • includes Bus disconnect, installation and wiring
    • includes Network cabling CAT6 for HMI, PLC and Robot controller with 3 spares
  • Production support for 90 hours
  • Spare and wear parts
    • Part contacting surfaces included
    • All controls are assumed to be on hand since they are Customer standard parts
    • Extra EOAT is supplied as backup
    • Lift and locate cylinders included
Lion